goals-projectMomentum

Difference between revision 2 and current revision

No diff available.

intro

I'm going to make a list of some projects.

major projects

(horizon)

minor projects

"Minor" is some combination of "not as important" and "doesn't take as long". Some of these are important but quick and others are unimportant but lengthly.

supplementary projects

Note: if i'm dead or something, the items in the list without links usually have a folder somewhere on my hard drive, usually in the folder 'projects' in my home directory.

rules for the above lists

Each entry is/for each entry:

This list is not/does not include:

This list not a list of high-priority things, things i want to remind myself of, things i haven't worked on but hope to do someday, or of how i actually spend my time right now, things that are urgent, things that are important, things that are almost done and just need to be gotten out the door, things that are the most promising, things that i definitely want to finish someday, but it is some combination of these lists.

I am grouping items together using my 'prime priority' method, which just means that i have a top priority, then a group of 2 priorites, then a group of 4 priorities, then a group of 6, then 10, then 14, etc (the numbers in each group are given by https://oeis.org/A075574 ). The ordering within each group is insignificant.

projects that require too much money or time

this is a separate list of projects, mostly charitable, that i may or not undertake someday if i ever have more time and money